ITAC Assessment: KG0044
ITAC logo
ITAC Assessment: KG0044
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Soft Drinking Bottling
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 162,528
ft2
Annual Production 9,000,000
units
Production Hrs. Annual 2,600
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $355,614 4,912,954
kWh
Natural Gas $47,671 12,864
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,212 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,639

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $12,881 $8,540 $12,881
142,732
kWh
-
02 2.4133: Use most efficient type of electric motors $8,508 $35,590 $8,508
128,077
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,573 - $3,573
39,566
kWh
-
04 2.4314: Use synthetic lubricant $2,418 $997 $2,418
26,671
kWh
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $1,473 $1,500 - $1,473
-
MMBtu
06 2.7261: Install timers and/or thermostats $1,314 $1,650 $1,314
47,186
kWh
-
07 2.7261: Install timers and/or thermostats $1,045 $1,200 $1,045
37,515
kWh
-
TOTAL RECOMMENDED $31,212 $49,477 $29,739
421,747
kWh
$1,473
-
MMBtu
TOTAL IMPLEMENTED $27,639 $49,477 $26,166
382,181
kWh
$1,473
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs