ITAC Assessment: UM0032
ITAC logo
ITAC Assessment: UM0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Injection molded plastic parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 32,500
ft2
Annual Production 750,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $259,077 3,905,920
kWh
Natural Gas $8,103 1,648
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,238 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $3,702 $3,130 n/a $3,702
56,272
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,380 $6,628 n/a $3,380
51,290
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $992 $50 n/a $992
14,947
kWh
04 2.4221: Install compressor air intakes in coolest locations $164 $600 n/a $164
2,638
kWh
TOTAL RECOMMENDED $8,238 $10,408 $8,238
125,147
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs