ITAC Assessment: KG0043
ITAC logo
ITAC Assessment: KG0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Saddles,Belts and Saddlery goods
NAICS
n/a
SIC 2387: Apparel belts
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 114,900
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 2,625
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,974 1,282,239
kWh
Natural Gas $10,443 2,428
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,304 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,997

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7261: Install timers and/or thermostats $16,635 $1,050 $16,635
317,409
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,423 $1,723 $5,423
70,633
kWh
03 2.4133: Use most efficient type of electric motors $1,198 $1,770 $1,198
15,533
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,041 $160 $1,041
13,482
kWh
05 2.7261: Install timers and/or thermostats $700 $450 $700
13,482
kWh
06 2.4314: Use synthetic lubricant $307 - $307
4,103
kWh
TOTAL RECOMMENDED $25,304 $5,153 $25,304
434,642
kWh
TOTAL IMPLEMENTED $24,997 $5,153 $24,997
430,539
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs