ITAC Assessment: KG0037
ITAC logo
ITAC Assessment: KG0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Shell & Tube Heat Exchangers
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 50,000
ft2
Annual Production 225
pieces
Production Hrs. Annual 5,304
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,066 1,313,013
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,526 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,782

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $7,793 $9,490 $7,793
114,302
kWh
02 2.4314: Use synthetic lubricant $2,390 - $2,390
36,635
kWh
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,212 $40 $1,212
32,532
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,622 $750 $1,622
48,945
kWh
05 2.7261: Install timers and/or thermostats $977 $600 $977
29,601
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $532 $175 $532
6,741
kWh
TOTAL RECOMMENDED $14,526 $11,055 $14,526
268,756
kWh
TOTAL IMPLEMENTED $12,782 $10,840 $12,782
229,483
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs