| Assessment Year | 1995 |
|---|---|
| Principal Product | Shell & Tube Heat Exchangers |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $5 M to 10M |
| # of Employees | 70 |
| Plant Area |
50,000
ft2
|
| Annual Production | 225
pieces
|
| Production Hrs. Annual | 5,304
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $88,066 | 1,313,013 |
kWh
|
$0.067 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $14,526 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $12,782 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $7,793 | $9,490 |
$7,793
114,302
kWh
|
|
| 02 | 2.4314: Use synthetic lubricant | $2,390 | - |
$2,390
36,635
kWh
|
|
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,212 | $40 |
$1,212
32,532
kWh
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,622 | $750 |
$1,622
48,945
kWh
|
|
| 05 | 2.7261: Install timers and/or thermostats | $977 | $600 |
$977
29,601
kWh
|
|
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $532 | $175 |
$532
6,741
kWh
|
|
| TOTAL RECOMMENDED | $14,526 | $11,055 |
$14,526
268,756
kWh
|
||
| TOTAL IMPLEMENTED | $12,782 | $10,840 |
$12,782
229,483
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs