ITAC Assessment: KG0030
ITAC logo
ITAC Assessment: KG0030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Milk,fruit,cream,cottage cheese,and ice cream mixes
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 34,521
ft2
Annual Production 28,800
Tgal
Production Hrs. Annual 8,112
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $388,119 8,849,942
kWh
Natural Gas $81,231 30,903
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,685 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,724

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $9,705 $19,230 $9,705
260,551
kWh
-
02 2.2414: Use waste heat from hot flue gases to preheat $8,534 $2,850 - $8,534
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $7,624 $2,518 - $7,624
-
MMBtu
04 2.7229: Air condition only space necessary $3,434 $5,070 $3,434
75,029
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,427 $780 $2,427
55,686
kWh
-
06 2.7261: Install timers and/or thermostats $2,297 $750 $2,297
75,029
kWh
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $664 $1,500 - $664
-
MMBtu
TOTAL RECOMMENDED $34,685 $32,698 $17,863
466,295
kWh
$16,822
-
MMBtu
TOTAL IMPLEMENTED $31,724 $30,448 $15,566
391,266
kWh
$16,158
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs