ITAC Assessment: KG0027
ITAC logo
ITAC Assessment: KG0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Frozen Vegetables
NAICS
n/a
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 450
Plant Area 167,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 4,875
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $897,675 14,489,742
kWh
Natural Gas $190,083 110,968
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,044 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,295

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $7,341 $4,000 - $7,341
-
MMBtu
02 2.4133: Use most efficient type of electric motors $6,037 $6,665 $6,037
106,975
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,917 $15,175 $5,917
93,787
kWh
-
04 2.6231: Utilize controls to operate equipment only when needed $1,749 $900 $1,749
60,375
kWh
-
TOTAL RECOMMENDED $21,044 $26,740 $13,703
261,137
kWh
$7,341
-
MMBtu
TOTAL IMPLEMENTED $19,295 $25,840 $11,954
200,762
kWh
$7,341
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs