ITAC Assessment: KG0019
ITAC logo
ITAC Assessment: KG0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Milk processing and plastic bottles for milk and orange juic
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 38,877
ft2
Annual Production 16,000
Tgal
Production Hrs. Annual 7,488
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $306,501 5,638,042
kWh
Natural Gas $14,003 4,892
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,839 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,341

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $6,677 $15,450 $6,677
193,728
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,148 $453 $2,148
40,152
kWh
-
03 2.2511: Insulate bare equipment $1,300 $107 $1,300
25,791
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,079 $1,470 $1,079
37,808
kWh
-
05 2.7135: Install occupancy sensors $795 $260 $795
27,843
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $421 $1,250 - $421
-
MMBtu
07 2.7261: Install timers and/or thermostats $419 $300 $419
14,654
kWh
-
TOTAL RECOMMENDED $12,839 $19,290 $12,418
339,976
kWh
$421
-
MMBtu
TOTAL IMPLEMENTED $11,341 $17,520 $10,920
287,514
kWh
$421
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings