ITAC Assessment: KG0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Corrugated board boxes.
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 108
Plant Area 210,000
ft2
Annual Production 40,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $317,068 5,576,495
kWh
Natural Gas $197,845 50,709
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,419 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,714

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $8,950 $20,870 $8,950
240,914
kWh
-
02 2.7261: Install timers and/or thermostats $7,434 $1,200 $7,434
259,965
kWh
-
03 2.2414: Use waste heat from hot flue gases to preheat $5,593 $2,685 - $5,593
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,727 $882 $2,727
43,083
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,255 $15 $2,255
58,617
kWh
-
06 2.2511: Insulate bare equipment $1,857 $178 - $1,857
-
MMBtu
07 2.7134: Use photocell controls $1,815 $187 $1,815
24,912
kWh
-
08 2.2136: Install / repair insulation on steam lines $423 $341 - $423
-
MMBtu
09 2.7135: Install occupancy sensors $365 $455 $365
12,896
kWh
-
TOTAL RECOMMENDED $31,419 $26,813 $23,546
640,387
kWh
$7,873
-
MMBtu
TOTAL IMPLEMENTED $21,714 $23,935 $21,291
581,770
kWh
$423
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs