ITAC Assessment: MZ0023
ITAC logo
ITAC Assessment: MZ0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Electronic Connectors, optical lenses, RF tags, medical diagnostic produ
NAICS 334111: Electronic Computer Manufacturing
SIC 3577: Computer Peripheral Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 250
Plant Area 175,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 4,335
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,640,509 42,499,780
kWh
Natural Gas $1,243,836 137,951
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $96,643 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $89,605

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $183 $80 - - $183
-
MMBtu
02 2.4131: Size electric motors for peak operating efficiency $5,828 $2,077 $4,328
97,017
kWh
$1,500
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $41,564 $27,000 $41,564
215,536
kWh
- -
04 2.4131: Size electric motors for peak operating efficiency $1,210 $1,941 $1,210
18,213
kWh
- -
05 2.2113: Repair or replace steam traps $47,858 $40,000 - - $47,858
-
MMBtu
TOTAL RECOMMENDED $96,643 $71,098 $47,102
330,766
kWh
$1,500
-
kW-mo/yr
$48,041
-
MMBtu
TOTAL IMPLEMENTED $89,605 $67,080 $41,564
215,536
kWh
- $48,041
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs