Assessment Year | 2008 |
---|---|
Principal Product | Electronic Connectors, optical lenses, RF tags, medical diagnostic produ |
NAICS | 334111: Electronic Computer Manufacturing |
SIC | 3577: Computer Peripheral Equipment, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 250 |
Plant Area |
175,000
ft2
|
Annual Production | 300,000
pieces
|
Production Hrs. Annual | 4,335
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,640,509 | 42,499,780 |
kWh
|
$0.062 |
Natural Gas | $1,243,836 | 137,951 |
MMBtu
|
$9.02 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $96,643 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $89,605 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $183 | $80 | - | - |
$183
-
MMBtu
|
|
02 | 2.4131: Size electric motors for peak operating efficiency | $5,828 | $2,077 |
$4,328
97,017
kWh
|
$1,500
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $41,564 | $27,000 |
$41,564
215,536
kWh
|
- | - | |
04 | 2.4131: Size electric motors for peak operating efficiency | $1,210 | $1,941 |
$1,210
18,213
kWh
|
- | - | |
05 | 2.2113: Repair or replace steam traps | $47,858 | $40,000 | - | - |
$47,858
-
MMBtu
|
|
TOTAL RECOMMENDED | $96,643 | $71,098 |
$47,102
330,766
kWh
|
$1,500
-
kW-mo/yr
|
$48,041
-
MMBtu
|
||
TOTAL IMPLEMENTED | $89,605 | $67,080 |
$41,564
215,536
kWh
|
- |
$48,041
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs