ITAC Assessment: AS0146
ITAC logo
ITAC Assessment: AS0146
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Manufactured Housing
NAICS
n/a
SIC 2451: Mobile Homes
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 82,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,960 744,725
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,760 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,572

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,459 $1,950 $3,459
58,910
kWh
-
02 2.7145: Install skylights $3,273 $4,780 $3,273
57,737
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,241 $6,930 $4,241
52,462
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,885 $16,546 $3,885
48,066
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $113 - $113
1,465
kWh
-
06 2.4133: Use most efficient type of electric motors $1,278 $2,399 $1,278
14,947
kWh
-
07 2.8112: Combine utility meters $6,511 $20,250 - $6,511
TOTAL RECOMMENDED $22,760 $52,855 $16,249
233,587
kWh
$6,511
TOTAL IMPLEMENTED $3,572 $1,950 $3,572
60,375
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs