ITAC Assessment: KG0013
ITAC logo
ITAC Assessment: KG0013
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Corrugated board boxes.
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 142
Plant Area 171,000
ft2
Annual Production 540,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $330,589 6,037,515
kWh
Natural Gas $231,112 59,440
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,419 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,115

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $1,249 $2,785 $1,249
43,669
kWh
-
02 2.4133: Use most efficient type of electric motors $11,859 $27,620 $11,859
289,566
kWh
-
03 2.7261: Install timers and/or thermostats $5,516 $1,800 $5,516
193,142
kWh
-
04 2.2511: Insulate bare equipment $3,691 $455 - $3,691
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,255 $2,685 $2,255
78,839
kWh
-
06 2.2414: Use waste heat from hot flue gases to preheat $2,109 $653 - $2,109
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,740 $1,419 $2,740
41,032
kWh
-
TOTAL RECOMMENDED $29,419 $37,417 $23,619
646,248
kWh
$5,800
-
MMBtu
TOTAL IMPLEMENTED $20,115 $30,839 $20,115
523,740
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs