ITAC Assessment: KG0009
ITAC logo
ITAC Assessment: KG0009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Variety Bread
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 60,000
ft2
Annual Production 488,500,000
lb
Production Hrs. Annual 5,200
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,758 2,091,442
kWh
Natural Gas $108,829 25,650
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,639 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1133: Adjust burners for efficient operation $8,262 $2,500 - $8,262
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $4,500 $2,500 - $4,500
-
MMBtu
03 2.6218: Turn off equipment when not in use $3,929 - $3,929
68,581
kWh
-
04 2.4133: Use most efficient type of electric motors $2,984 $7,370 $2,984
59,496
kWh
-
05 2.2437: Recover waste heat from equipment $2,527 $8,800 - $2,527
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,017 $810 $2,017
60,668
kWh
-
07 2.7261: Install timers and/or thermostats $1,662 $300 $1,662
50,117
kWh
-
08 2.1213: Direct warmest air to combustion intake $1,387 $100 - $1,387
-
MMBtu
09 2.7135: Install occupancy sensors $371 $260 $371
11,137
kWh
-
TOTAL RECOMMENDED $27,639 $22,640 $10,963
249,999
kWh
$16,676
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs