ITAC Assessment: GT0497
ITAC logo
ITAC Assessment: GT0497
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Cotton Cloth
NAICS
n/a
SIC 2211: Broadwoven Fabric Mills, Cotton
Sales Range $10
M
to 50
M
# of Employees 500
Plant Area 239,890
ft2
Annual Production 12,800,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,927,529 57,401,232
kWh
Natural Gas $67,134 25,652
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,115 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,370

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $20,750 $85,360 $20,750
468,347
kWh
-
02 2.1221: Replace obsolete burners with more efficient ones $7,440 $6,000 - $7,440
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $5,025 $2,000 $5,025
149,766
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $16,170 $60,500 $16,170
481,243
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,745 - $1,745
51,876
kWh
-
06 2.1212: Operate boilers on high fire setting $1,035 - - $1,035
-
MMBtu
07 2.1242: Minimize boiler blowdown with better feedwater treatment $535 - - $535
-
MMBtu
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $26,415 $24,720 $26,415
786,049
kWh
-
TOTAL RECOMMENDED $79,115 $178,580 $70,105
1,937,281
kWh
$9,010
-
MMBtu
TOTAL IMPLEMENTED $64,370 $170,580 $63,335
1,735,639
kWh
$1,035
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs