Assessment Year | 1993 |
---|---|
Principal Product | Cotton Cloth |
NAICS |
n/a
|
SIC | 2211: Broadwoven Fabric Mills, Cotton |
Sales Range | $10 M to 50M |
# of Employees | 500 |
Plant Area |
239,890
ft2
|
Annual Production | 12,800,000
thousand feet
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,927,529 | 57,401,232 |
kWh
|
$0.034 |
Natural Gas | $67,134 | 25,652 |
MMBtu
|
$2.62 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $79,115 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $64,370 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,750 | $85,360 |
$20,750
468,347
kWh
|
- | |
02 | 2.1221: Replace obsolete burners with more efficient ones | $7,440 | $6,000 | - |
$7,440
-
MMBtu
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $5,025 | $2,000 |
$5,025
149,766
kWh
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $16,170 | $60,500 |
$16,170
481,243
kWh
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,745 | - |
$1,745
51,876
kWh
|
- | |
06 | 2.1212: Operate boilers on high fire setting | $1,035 | - | - |
$1,035
-
MMBtu
|
|
07 | 2.1242: Minimize boiler blowdown with better feedwater treatment | $535 | - | - |
$535
-
MMBtu
|
|
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $26,415 | $24,720 |
$26,415
786,049
kWh
|
- | |
TOTAL RECOMMENDED | $79,115 | $178,580 |
$70,105
1,937,281
kWh
|
$9,010
-
MMBtu
|
||
TOTAL IMPLEMENTED | $64,370 | $170,580 |
$63,335
1,735,639
kWh
|
$1,035
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs