ITAC Assessment: KG0001
ITAC logo
ITAC Assessment: KG0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Plastic Product
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 70
Plant Area 29,500
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,982 2,012,603
kWh
Natural Gas $433 65
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,165 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,187

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6218: Turn off equipment when not in use $9,187 - $9,187
143,318
kWh
02 2.2511: Insulate bare equipment $8,319 $129 $8,319
131,887
kWh
03 2.4133: Use most efficient type of electric motors $7,000 $8,050 $7,000
111,079
kWh
04 2.4323: Use optimum size and capacity equipment $2,284 $22,000 $2,284
31,653
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $795 $238 $795
12,016
kWh
06 2.4221: Install compressor air intakes in coolest locations $580 $310 $580
9,379
kWh
TOTAL RECOMMENDED $28,165 $30,727 $28,165
439,332
kWh
TOTAL IMPLEMENTED $9,187 - $9,187
143,318
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs