Assessment Year | 2025 |
---|---|
Principal Product | Fabricated Metal Housings |
NAICS | 332439: Other Metal Container Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 105 |
Plant Area |
72,729
ft2
|
Annual Production | 250
units
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $98,078 | 1,261,912 |
kWh
|
$0.078 |
Electricity Demand | $29,480 | 4,230 |
kW-mo/yr
|
$6.97 |
Electricity Fees | $26,915 | - |
|
- |
Natural Gas | $37,093 | 3,692 |
MMBtu
|
$10.05 |
TOTAL YEARLY COSTS | $191,566 | |||
RECOMMENDED SAVINGS* | $90,596 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $411 | - |
$411
5,270
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,526 | $2,160 |
$5,526
70,852
kWh
|
- | - | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $3,384 | $7,500 | - | - |
$3,384
-
MMBtu
|
|
04 | 2.4133: Use most efficient type of electric motors | $1,825 | $8,450 |
$1,203
15,475
kWh
|
$622
-
kW-mo/yr
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $434 | $2,275 |
$286
3,675
kWh
|
$148
-
kW-mo/yr
|
- | |
06 | 2.9114: Use solar heat to make electricty | $79,016 | $599,215 |
$68,180
877,236
kWh
|
$10,836
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $90,596 | $619,600 |
$75,606
972,508
kWh
|
$11,606
-
kW-mo/yr
|
$3,384
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs