ITAC Assessment: UL2419
ITAC logo
ITAC Assessment: UL2419
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Fabricated Metal Housings
NAICS 332439: Other Metal Container Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 72,729
ft2
Annual Production 250
units
Production Hrs. Annual 2,080
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,078 1,261,912
kWh
Electricity Demand $29,480 4,230
kW-mo/yr
Electricity Fees $26,915 -
Natural Gas $37,093 3,692
MMBtu
TOTAL YEARLY COSTS $191,566
RECOMMENDED SAVINGS* $90,596 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $411 - $411
5,270
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,526 $2,160 $5,526
70,852
kWh
- -
03 2.2414: Use waste heat from hot flue gases to preheat $3,384 $7,500 - - $3,384
-
MMBtu
04 2.4133: Use most efficient type of electric motors $1,825 $8,450 $1,203
15,475
kWh
$622
-
kW-mo/yr
-
05 2.4133: Use most efficient type of electric motors $434 $2,275 $286
3,675
kWh
$148
-
kW-mo/yr
-
06 2.9114: Use solar heat to make electricty $79,016 $599,215 $68,180
877,236
kWh
$10,836
-
kW-mo/yr
-
TOTAL RECOMMENDED $90,596 $619,600 $75,606
972,508
kWh
$11,606
-
kW-mo/yr
$3,384
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs