Assessment Year | 2024 |
---|---|
Principal Product | Power transmission |
NAICS | 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $50 M to 100M |
# of Employees | 220 |
Plant Area |
401,190
ft2
|
Annual Production | 94,831,486
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $810,355 | 19,902,400 |
kWh
|
$0.041 | |
Electricity Demand | $1,384,281 | 43,814 |
kW-mo/yr
|
$31.59 | |
Electricity Fees | $3,117 | - |
|
- | |
Natural Gas | $953,362 | 221,983 |
MMBtu
|
$4.29 | |
Waste Disposal Costs | |||||
Water Usage | $124,621 | 244,895 |
Tgal
|
$0.51 | |
TOTAL YEARLY COSTS | $3,275,736 | ||||
RECOMMENDED SAVINGS* | $104,306 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $11,129 | - |
$5,414
132,059
kWh
|
$5,715
-
kW-mo/yr
|
- | |
02 | 2.6231: Utilize controls to operate equipment only when needed | $9,809 | - |
$9,809
239,236
kWh
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $8,195 | - |
$3,987
97,232
kWh
|
$4,208
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,176 | $60 |
$2,518
61,413
kWh
|
$2,658
-
kW-mo/yr
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $40,876 | $11,711 |
$40,876
996,976
kWh
|
- | - | |
06 | 2.7135: Install occupancy sensors | $1,572 | $559 |
$765
18,648
kWh
|
$807
-
kW-mo/yr
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,128 | $4,817 |
$1,009
24,598
kWh
|
$8,119
-
kW-mo/yr
|
- | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $16,672 | $10,914 |
$16,672
406,634
kWh
|
- | - | |
09 | 2.7231: Use radiant heater for spot heating | $1,750 | $1,800 | - | - |
$1,750
-
MMBtu
|
|
TOTAL RECOMMENDED | $104,306 | $29,860 |
$81,050
1,976,796
kWh
|
$21,507
-
kW-mo/yr
|
$1,750
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs