ITAC Assessment: IP0190
ITAC logo
ITAC Assessment: IP0190
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Power transmission
NAICS 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 220
Plant Area 401,190
ft2
Annual Production 94,831,486
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $810,355 19,902,400
kWh
Electricity Demand $1,384,281 43,814
kW-mo/yr
Electricity Fees $3,117 -
Natural Gas $953,362 221,983
MMBtu
Waste Disposal Costs
Water Usage $124,621 244,895
Tgal
TOTAL YEARLY COSTS $3,275,736
RECOMMENDED SAVINGS* $104,306 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $11,129 - $5,414
132,059
kWh
$5,715
-
kW-mo/yr
-
02 2.6231: Utilize controls to operate equipment only when needed $9,809 - $9,809
239,236
kWh
- -
03 2.4133: Use most efficient type of electric motors $8,195 - $3,987
97,232
kWh
$4,208
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,176 $60 $2,518
61,413
kWh
$2,658
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $40,876 $11,711 $40,876
996,976
kWh
- -
06 2.7135: Install occupancy sensors $1,572 $559 $765
18,648
kWh
$807
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $9,128 $4,817 $1,009
24,598
kWh
$8,119
-
kW-mo/yr
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,672 $10,914 $16,672
406,634
kWh
- -
09 2.7231: Use radiant heater for spot heating $1,750 $1,800 - - $1,750
-
MMBtu
TOTAL RECOMMENDED $104,306 $29,860 $81,050
1,976,796
kWh
$21,507
-
kW-mo/yr
$1,750
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs