Assessment Year | 2024 |
---|---|
Principal Product | Plastic Automotive Parts |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 152 |
Plant Area |
105,000
ft2
|
Annual Production | 13,522,749
pieces
|
Production Hrs. Annual | 6,264
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $400,289 | 6,225,118 |
kWh
|
$0.064 | |
Electricity Demand | $300,560 | 14,968 |
kW-mo/yr
|
$20.08 | |
Electricity Fees | $588 | - |
|
- | |
Natural Gas | $10,236 | 876 |
MMBtu
|
$11.68 | |
Waste Disposal Costs | |||||
Water Usage | $6,613 | 1,087 |
Tgal
|
$6.08 | |
Water Disposal | $10,841 | 1,087 |
Tgal
|
$9.97 | |
TOTAL YEARLY COSTS | $729,127 | ||||
RECOMMENDED SAVINGS* | $56,095 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $56,095 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,450 | $33 |
$2,780
43,437
kWh
|
$1,670
-
kW-mo/yr
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $2,822 | - |
$1,762
27,562
kWh
|
$1,060
-
kW-mo/yr
|
- | |
03 | 2.7224: Reduce space conditioning during non-working hours | $3,852 | $325 |
$75
1,166
kWh
|
- |
$3,777
-
MMBtu
|
|
04 | 2.7135: Install occupancy sensors | $1,248 | $716 |
$1,084
16,937
kWh
|
$164
-
kW-mo/yr
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $43,723 | $84,496 |
$19,868
310,442
kWh
|
$23,855
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $56,095 | $85,570 |
$25,569
399,544
kWh
|
$26,749
-
kW-mo/yr
|
$3,777
-
MMBtu
|
||
TOTAL IMPLEMENTED | $56,095 | $85,570 |
$25,569
399,544
kWh
|
$26,749
-
kW-mo/yr
|
$3,777
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs