ITAC Assessment: IP0189
ITAC logo
ITAC Assessment: IP0189
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Plastic Automotive Parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 152
Plant Area 105,000
ft2
Annual Production 13,522,749
pieces
Production Hrs. Annual 6,264
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $400,289 6,225,118
kWh
Electricity Demand $300,560 14,968
kW-mo/yr
Electricity Fees $588 -
Natural Gas $10,236 876
MMBtu
Waste Disposal Costs
Water Usage $6,613 1,087
Tgal
Water Disposal $10,841 1,087
Tgal
TOTAL YEARLY COSTS $729,127
RECOMMENDED SAVINGS* $56,095 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,095

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,450 $33 $2,780
43,437
kWh
$1,670
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $2,822 - $1,762
27,562
kWh
$1,060
-
kW-mo/yr
-
03 2.7224: Reduce space conditioning during non-working hours $3,852 $325 $75
1,166
kWh
- $3,777
-
MMBtu
04 2.7135: Install occupancy sensors $1,248 $716 $1,084
16,937
kWh
$164
-
kW-mo/yr
-
05 2.4133: Use most efficient type of electric motors $43,723 $84,496 $19,868
310,442
kWh
$23,855
-
kW-mo/yr
-
TOTAL RECOMMENDED $56,095 $85,570 $25,569
399,544
kWh
$26,749
-
kW-mo/yr
$3,777
-
MMBtu
TOTAL IMPLEMENTED $56,095 $85,570 $25,569
399,544
kWh
$26,749
-
kW-mo/yr
$3,777
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs