| Assessment Year | 2021 |
|---|---|
| Principal Product | Medical Devices |
| NAICS | 339112: Surgical and Medical Instrument Manufacturing |
| SIC | 3841: Surgical and Medical Instruments and Apparatus |
| Sales Range | $50 M to 100M |
| # of Employees | 380 |
| Plant Area |
93,000
ft2
|
| Annual Production | 115,000
units
|
| Production Hrs. Annual | 6,075
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $118,291 | 2,467,051 |
kWh
|
$0.048 | |
| Electricity Demand | $84,600 | 4,784 |
kW-mo/yr
|
$17.68 | |
| Natural Gas | $4,557 | 540 |
MMBtu
|
$8.44 | |
| Waste Disposal Costs | |||||
| Water Usage | $7,483 | 714 |
Tgal
|
$10.47 | |
| TOTAL YEARLY COSTS | $214,931 | ||||
| RECOMMENDED SAVINGS* | $11,693 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $11,693 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7221: Lower temperature during the winter season and vice-versa | $469 | - |
$359
7,488
kWh
|
- |
$110
-
MMBtu
|
|
| 02 | 2.7212: Install or upgrade insulation on hvac distribution systems | $7,392 | $260 |
$7,392
154,314
kWh
|
- | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,150 | $50 |
$707
14,770
kWh
|
$443
-
kW-mo/yr
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $1,959 | $3,259 |
$1,959
40,909
kWh
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $588 | $1,028 |
$340
7,108
kWh
|
$248
-
kW-mo/yr
|
- | |
| 06 | 2.7135: Install occupancy sensors | $135 | $275 |
$135
2,813
kWh
|
- | - | |
| TOTAL RECOMMENDED | $11,693 | $4,872 |
$10,892
227,402
kWh
|
$691
-
kW-mo/yr
|
$110
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $11,693 | $4,872 |
$10,892
227,402
kWh
|
$691
-
kW-mo/yr
|
$110
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs