Assessment Year 2020
Principal Product Pharmaceuticals
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 72,000
ft2
Annual Production 181,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $152,749 3,662,400
kWh
Electricity Demand $204,434 7,848
kW-mo/yr
Electricity Fees $48,056 -
Natural Gas $144,520 31,044
MMBtu
Waste Disposal Costs
Water Usage $28,433 7,159
Tgal
Water Disposal $33,867 4,928
Tgal
TOTAL YEARLY COSTS $612,059
RECOMMENDED SAVINGS* $55,403 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 4.821: Pay bills on time to avoid late fees $266 - - - - $266
02 2.4322: Use or replace with energy efficient substitutes $578 - $324
7,118
kWh
$254
-
kW-mo/yr
- -
03 2.7291: Reschedule and rearrange multiple-source heating systems $4,697 - $191
4,194
kWh
- $4,506
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $842 $176 $842
18,485
kWh
- - -
05 4.812: Apply for investment incentives $26,189 $10,000 - - - $26,189
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $122 $45 $57
1,254
kWh
$65
-
kW-mo/yr
- -
07 2.7447: Install vinyl strip / high speed / air curtain doors $9,775 $4,980 $9,775
214,568
kWh
- - -
08 2.7135: Install occupancy sensors $367 $360 $367
8,052
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $12,567 $23,537 $5,488
120,473
kWh
$7,079
-
kW-mo/yr
- -
TOTAL RECOMMENDED $55,403 $39,098 $17,044
374,144
kWh
$7,398
-
kW-mo/yr
$4,506
-
MMBtu
$26,455
TOTAL IMPLEMENTED - - - - - -