ITAC Assessment: IP0111
ITAC logo
ITAC Assessment: IP0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Metal Plating
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 68
Plant Area 50,000
ft2
Annual Production 300,000,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,836 3,845,160
kWh
Electricity Demand $218,709 8,392
kW-mo/yr
Electricity Fees $1,055 -
Natural Gas $42,338 6,030
MMBtu
TOTAL YEARLY COSTS $387,938
RECOMMENDED SAVINGS* $15,960 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,439

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $1,378 - $185
5,650
kWh
- $1,193
-
MMBtu
02 2.4322: Use or replace with energy efficient substitutes $767 - $298
9,119
kWh
$469
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $780 $217 $373
11,406
kWh
$407
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $1,101 $893 $1,101
33,626
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $10,069 $26,837 $3,710
113,341
kWh
$6,359
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $280 $801 $280
8,546
kWh
- -
07 2.4322: Use or replace with energy efficient substitutes $95 $295 $95
2,892
kWh
- -
08 2.4239: Eliminate or reduce compressed air usage $1,310 $4,238 $1,310
40,029
kWh
- -
09 2.4221: Install compressor air intakes in coolest locations $180 $679 $86
2,628
kWh
$94
-
kW-mo/yr
-
TOTAL RECOMMENDED $15,960 $33,960 $7,438
227,237
kWh
$7,329
-
kW-mo/yr
$1,193
-
MMBtu
TOTAL IMPLEMENTED $3,439 $1,789 $1,745
53,310
kWh
$501
-
kW-mo/yr
$1,193
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs