ITAC Assessment: IP0110
ITAC logo
ITAC Assessment: IP0110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product PVD Wheels (chrome plastic coating on wheels)
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 75
Plant Area 188,500
ft2
Annual Production 260,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $450,511 6,615,000
kWh
Electricity Demand $153,685 15,584
kW-mo/yr
Electricity Fees $10,155 -
Natural Gas $300,003 61,334
MMBtu
TOTAL YEARLY COSTS $914,354
RECOMMENDED SAVINGS* $87,426 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $72,598

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $23,973 $5 $18,589
272,964
kWh
$5,384
-
kW-mo/yr
-
02 2.7224: Reduce space conditioning during non-working hours $742 - $253
3,721
kWh
- $489
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,835 $130 $4,835
71,003
kWh
- -
04 2.4239: Eliminate or reduce compressed air usage $1,072 $30 $1,072
15,737
kWh
- -
05 2.7135: Install occupancy sensors $21,079 $3,360 $21,079
309,523
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,905 $5,340 $3,027
44,453
kWh
$878
-
kW-mo/yr
-
07 2.7241: Install outside air damper / economizer on hvac unit $13,014 $13,520 $13,014
191,097
kWh
- -
08 2.2511: Insulate bare equipment $655 $945 - - $655
-
MMBtu
09 2.4221: Install compressor air intakes in coolest locations $11,070 $21,274 $8,585
126,060
kWh
$2,485
-
kW-mo/yr
-
10 2.2414: Use waste heat from hot flue gases to preheat $7,081 $30,250 - - $7,081
-
MMBtu
TOTAL RECOMMENDED $87,426 $74,854 $70,454
1,034,558
kWh
$8,747
-
kW-mo/yr
$8,225
-
MMBtu
TOTAL IMPLEMENTED $72,598 $61,304 $56,115
824,003
kWh
$8,747
-
kW-mo/yr
$7,736
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs