Assessment Year | 2018 |
---|---|
Principal Product | Potable Drinking Water |
NAICS | 221310: Water Supply and Irrigation Systems |
SIC | 4941: Water Supply |
Sales Range | $50 M to 100M |
# of Employees | 25 |
Plant Area |
2,000,000
ft2
|
Annual Production | 23,900,000
units
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,043,580 | 24,549,800 |
kWh
|
$0.043 |
Electricity Demand | $866,818 | 47,837 |
kW-mo/yr
|
$18.12 |
Electricity Fees | $(-79,482.9) | - |
|
- |
Natural Gas | $25,786 | 5,846 |
MMBtu
|
$4.41 |
TOTAL YEARLY COSTS | $1,856,701 | |||
RECOMMENDED SAVINGS* | $27,796 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,892 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7224: Reduce space conditioning during non-working hours | $1,413 | - |
$718
16,894
kWh
|
- |
$695
-
MMBtu
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $524 | $110 |
$524
12,335
kWh
|
- | - | |
03 | 2.7135: Install occupancy sensors | $220 | $186 |
$220
5,147
kWh
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,414 | $5,213 |
$2,414
56,784
kWh
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $738 | $1,819 |
$477
11,232
kWh
|
$261
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,488 | $32,763 |
$6,437
151,415
kWh
|
$6,051
-
kW-mo/yr
|
- | |
07 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $9,339 | $29,295 |
$585
13,755
kWh
|
- |
$8,754
-
MMBtu
|
|
08 | 2.2437: Recover waste heat from equipment | $660 | $2,876 |
$(-34.5)
(-811)
kWh
|
$(-27.2)
-
kW-mo/yr
|
$722
-
MMBtu
|
|
TOTAL RECOMMENDED | $27,796 | $72,261 |
$11,341
266,751
kWh
|
$6,285
-
kW-mo/yr
|
$10,170
-
MMBtu
|
||
TOTAL IMPLEMENTED | $13,892 | $35,935 |
$7,147
168,086
kWh
|
$6,024
-
kW-mo/yr
|
$722
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs