ITAC Assessment: MA0455
ITAC logo
ITAC Assessment: MA0455
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product High performance Plastics
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 100,000
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 6,656
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $437,569 6,972,743
kWh
Electricity Demand $50,791 17,947
kW-mo/yr
Electricity Fees $2,837 -
Natural Gas $119,468 25,173
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $171,763 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $93,496 $240,000 $112,979
1,847,890
kWh
$12,327
-
kW-mo/yr
$(-31,810.0)
-
MMBtu
02 2.2212: Use minimum safe oven ventilation $33,134 $16,250 - $33,134
-
kW-mo/yr
-
03 2.2414: Use waste heat from hot flue gases to preheat $24,310 $50,000 - - $24,310
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,701 $16,000 $16,701
273,154
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,122 $8,000 $4,122
67,409
kWh
- -
TOTAL RECOMMENDED $171,763 $330,250 $133,802
2,188,453
kWh
$45,461
-
kW-mo/yr
$(-7,500.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs