Assessment Year | 1985 |
---|---|
Principal Product | CUSTOM THERMOFORM PLASTIC |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 30 |
Plant Area |
n/a
|
Annual Production | 750,000
lb
|
Production Hrs. Annual | 2,184
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $73,462 | 674,971 |
kWh
|
$0.11 |
Natural Gas | $5,522 | 1,299 |
MMBtu
|
$4.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,987 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,370 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $7,203 | $4,000 |
$7,396
9,086
kWh
|
$(-193.0)
-
MMBtu
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $956 | $150 |
$956
8,792
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $414 | $1,200 |
$414
3,810
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $414 | $350 |
$414
3,810
kWh
|
- | |
TOTAL RECOMMENDED | $8,987 | $5,700 |
$9,180
25,498
kWh
|
$(-193.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,370 | $1,350 |
$1,370
12,602
kWh
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs