Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Library Services
NAICS 519120: Libraries and Archives
SIC 8231: Libraries
Sales Range less than $500
k
# of Employees 150
Plant Area 288,000
ft2
Annual Production 1
units
Production Hrs. Annual 5,175
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $260,059 4,803,477
kWh
Electricity Demand $96,677 8,023
kW-mo/yr
Electricity Fees $(-10,715.0) -
Other Gas $102,647 7,444
MMBtu
Other Energy $446,518 20,296
MMBtu
TOTAL YEARLY COSTS $895,186
RECOMMENDED SAVINGS* $52,394 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,335

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7311: Ventilation system to shut off when room is not in use $4,035 $25 $4,035
74,520
kWh
-
02 2.6211: Conserve energy by efficient use of vending machines $346 - $265
4,901
kWh
$81
-
kW-mo/yr
03 2.6231: Utilize controls to operate equipment only when needed $10,059 $1,113 $10,059
185,803
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $37,954 $94,718 $25,036
462,438
kWh
$12,918
-
kW-mo/yr
TOTAL RECOMMENDED $52,394 $95,856 $39,395
727,662
kWh
$12,999
-
kW-mo/yr
TOTAL IMPLEMENTED $42,335 $94,743 $29,336
541,859
kWh
$12,999
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs