Assessment Year | 2017 |
---|---|
Principal Product | Treatment of Raw Sewage |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $1 M to 5M |
# of Employees | 12 |
Plant Area |
895,216
ft2
|
Annual Production | 315
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $121,207 | 3,223,215 |
kWh
|
$0.038 | |
Electricity Demand | $112,563 | 4,563 |
kW-mo/yr
|
$24.67 | |
Electricity Fees | $2,598 | - |
|
- | |
Natural Gas | $13,362 | 2,157 |
MMBtu
|
$6.19 | |
Waste Disposal Costs | |||||
Water Usage | $49,478 | 19,856,900 |
Tgal
|
$0.002 | |
TOTAL YEARLY COSTS | $299,208 | ||||
RECOMMENDED SAVINGS* | $42,522 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $35,704 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings |
---|---|---|---|---|---|---|---|
01 | 3.5132: Reuse rich white water in other applications | $21,884 | $224 |
$123
3,266
kWh
|
$111
-
kW-mo/yr
|
$21,650
-
Tgal
|
|
02 | 2.7111: Reduce illumination to minimum necessary levels | $4,005 | $186 |
$1,217
32,380
kWh
|
$2,788
-
kW-mo/yr
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,654 | $396 |
$2,977
79,190
kWh
|
$2,677
-
kW-mo/yr
|
- | |
04 | 2.4322: Use or replace with energy efficient substitutes | $989 | $190 |
$249
6,630
kWh
|
$740
-
kW-mo/yr
|
- | |
05 | 2.7135: Install occupancy sensors | $1,298 | $1,953 |
$1,298
34,531
kWh
|
- | - | |
06 | 2.7241: Install outside air damper / economizer on hvac unit | $332 | $529 |
$332
8,828
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,789 | $11,754 |
$1,739
46,253
kWh
|
$4,050
-
kW-mo/yr
|
- | |
08 | 2.3322: Use existing dam to generate electricity | $1,432 | $3,507 |
$754
20,060
kWh
|
$678
-
kW-mo/yr
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $60 | $264 |
$60
1,585
kWh
|
- | - | |
10 | 2.2622: Replace existing chiller with high efficiency model | $1,079 | $5,047 |
$457
12,166
kWh
|
$622
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $42,522 | $24,050 |
$9,206
244,889
kWh
|
$11,666
-
kW-mo/yr
|
$21,650
-
Tgal
|
||
TOTAL IMPLEMENTED | $35,704 | $19,374 |
$6,594
175,406
kWh
|
$7,460
-
kW-mo/yr
|
$21,650
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs