Assessment Year | 2016 |
---|---|
Principal Product | Car Seats |
NAICS | 336360: Motor Vehicle Seating and Interior Trim Manufacturing |
SIC | 2396: Automotive Trimmings, Apparel Findings, and Related Products |
Sales Range | $100 M to 500M |
# of Employees | 380 |
Plant Area |
233,500
ft2
|
Annual Production | 234,067
units
|
Production Hrs. Annual | 5,880
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $301,979 | 4,588,510 |
kWh
|
$0.066 | |
Electricity Demand | $110,445 | 9,922 |
kW-mo/yr
|
$11.13 | |
Electricity Fees | $9,903 | - |
|
- | |
Natural Gas | $42,549 | 5,123 |
MMBtu
|
$8.31 | |
Waste Disposal Costs | |||||
Water Usage | $10,297 | 247,000 |
Tgal
|
$0.042 | |
TOTAL YEARLY COSTS | $475,173 | ||||
RECOMMENDED SAVINGS* | $92,563 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $46,459 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4323: Use optimum size and capacity equipment | $490 | - |
$398
6,045
kWh
|
$92
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,282 | $21 |
$1,694
25,734
kWh
|
$588
-
kW-mo/yr
|
- | |
03 | 2.2621: Modify refrigeration system to operate at a lower pressure | $5,637 | $3 |
$4,190
63,665
kWh
|
$1,447
-
kW-mo/yr
|
- | |
04 | 2.7135: Install occupancy sensors | $9,327 | $377 |
$9,327
141,731
kWh
|
- | - | |
05 | 2.3192: Use fossil fuel powered generator during peak demand periods | $50 | $5 | - |
$50
-
kW-mo/yr
|
- | |
06 | 2.2531: Re-size charging openings or add movable cover or door | $2,989 | $215 | - | - |
$2,989
-
MMBtu
|
|
07 | 2.4323: Use optimum size and capacity equipment | $27,384 | $7,218 |
$27,384
416,100
kWh
|
- | - | |
08 | 2.7241: Install outside air damper / economizer on hvac unit | $22,750 | $12,163 |
$22,750
345,693
kWh
|
- | - | |
09 | 2.2437: Recover waste heat from equipment | $1,712 | $1,271 | - | - |
$1,712
-
MMBtu
|
|
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,756 | $4,316 |
$2,576
39,145
kWh
|
$1,180
-
kW-mo/yr
|
- | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $231 | $351 |
$231
3,504
kWh
|
- | - | |
12 | 2.7447: Install vinyl strip / high speed / air curtain doors | $15,955 | $38,395 | - | - |
$15,955
-
MMBtu
|
|
TOTAL RECOMMENDED | $92,563 | $64,335 |
$68,550
1,041,617
kWh
|
$3,357
-
kW-mo/yr
|
$20,656
-
MMBtu
|
||
TOTAL IMPLEMENTED | $46,459 | $12,498 |
$41,610
632,259
kWh
|
$1,860
-
kW-mo/yr
|
$2,989
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs