ITAC Assessment: IP0062
ITAC logo
ITAC Assessment: IP0062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Ethanol
NAICS 325110: Petrochemical Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 39
Plant Area 123,479
ft2
Annual Production 50,000
Tgal
Production Hrs. Annual 8,640
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,637,983 33,974,489
kWh
Electricity Demand $576,895 41,804
kW-mo/yr
Electricity Fees $76,289 -
Natural Gas $4,989,912 1,289,308
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,436 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,417

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $13,450 $7 $2,293
47,712
kWh
- $11,157
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $967 $22 $967
20,140
kWh
- -
03 2.4323: Use optimum size and capacity equipment $605 - $436
9,067
kWh
$169
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $19,981 $2,354 $19,981
415,846
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,081 $4,092 $7,821
162,778
kWh
$260
-
kW-mo/yr
-
06 2.7144: Install spectral reflectors / delamp $1,743 $2,278 $1,243
25,875
kWh
$500
-
kW-mo/yr
-
07 2.4131: Size electric motors for peak operating efficiency $8,609 $12,262 $8,354
166,219
kWh
$255
-
kW-mo/yr
-
TOTAL RECOMMENDED $53,436 $21,015 $41,095
847,637
kWh
$1,184
-
kW-mo/yr
$11,157
-
MMBtu
TOTAL IMPLEMENTED $14,417 $29 $3,260
67,852
kWh
- $11,157
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs