Assessment Year | 2006 |
---|---|
Principal Product | Optical scanning |
NAICS | 334118: Computer Terminal and Other Computer Peripheral Equipment Manufacturing |
SIC | 3577: Computer Peripheral Equipment, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 73 |
Plant Area |
42,000
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 5,334
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $118,000 | 1,590,093 |
kWh
|
$0.074 |
Electricity Demand | $5,449 | 3,619 |
kW-mo/yr
|
$1.51 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,861 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,582 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,359 | $18,572 |
$2,070
29,248
kWh
|
$289
-
kW-mo/yr
|
|
02 | 2.4224: Upgrade controls on compressors | $2,260 | $10,000 |
$2,093
29,560
kWh
|
$167
-
kW-mo/yr
|
|
03 | 2.4323: Use optimum size and capacity equipment | $2,254 | $3,300 |
$2,088
29,491
kWh
|
$166
-
kW-mo/yr
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,765 | $1,000 |
$1,633
23,070
kWh
|
$132
-
kW-mo/yr
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,338 | $5,000 |
$1,250
17,661
kWh
|
$88
-
kW-mo/yr
|
|
06 | 2.7232: Replace existing hvac unit with high efficiency model | $885 | $13,820 |
$818
11,553
kWh
|
$67
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $10,861 | $51,692 |
$9,952
140,583
kWh
|
$909
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $4,582 | $37,392 |
$4,138
58,462
kWh
|
$444
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs