ITAC Assessment: AS0420
ITAC logo
ITAC Assessment: AS0420
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Optical scanning
NAICS 334118: Computer Terminal and Other Computer Peripheral Equipment Manufacturing
SIC 3577: Computer Peripheral Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 73
Plant Area 42,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 5,334
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,000 1,590,093
kWh
Electricity Demand $5,449 3,619
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,861 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,582

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,359 $18,572 $2,070
29,248
kWh
$289
-
kW-mo/yr
02 2.4224: Upgrade controls on compressors $2,260 $10,000 $2,093
29,560
kWh
$167
-
kW-mo/yr
03 2.4323: Use optimum size and capacity equipment $2,254 $3,300 $2,088
29,491
kWh
$166
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,765 $1,000 $1,633
23,070
kWh
$132
-
kW-mo/yr
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,338 $5,000 $1,250
17,661
kWh
$88
-
kW-mo/yr
06 2.7232: Replace existing hvac unit with high efficiency model $885 $13,820 $818
11,553
kWh
$67
-
kW-mo/yr
TOTAL RECOMMENDED $10,861 $51,692 $9,952
140,583
kWh
$909
-
kW-mo/yr
TOTAL IMPLEMENTED $4,582 $37,392 $4,138
58,462
kWh
$444
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs