ITAC Assessment: IP0054
ITAC logo
ITAC Assessment: IP0054
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Corporate Leasing Space
NAICS 541990: All Other Professional, Scientific, and Technical Services
SIC 8999: Services, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 480
Plant Area 171,000
ft2
Annual Production 171,000
thousand feet
Production Hrs. Annual 2,250
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $245,834 3,416,450
kWh
Electricity Demand $33,749 3,199
kW-mo/yr
Electricity Fees $19,028 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,647 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $576

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.6231: Utilize controls to operate equipment only when needed $329 - $329
5,670
kWh
- -
02 4.821: Pay bills on time to avoid late fees $576 - - - $576
03 2.7221: Lower temperature during the winter season and vice-versa $20,367 $2,184 $20,367
254,583
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $375 $1,348 $190
3,276
kWh
$185
-
kW-mo/yr
-
TOTAL RECOMMENDED $21,647 $3,532 $20,886
263,529
kWh
$185
-
kW-mo/yr
$576
TOTAL IMPLEMENTED $576 - - - $576
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs