Assessment Year | 2015 |
---|---|
Principal Product | Bottled and Canned Soft Drinks |
NAICS | 312111: Soft Drink Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $10 M to 50M |
# of Employees | 451 |
Plant Area |
211,000
ft2
|
Annual Production | 25,000,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $382,531 | 7,373,800 |
kWh
|
$0.052 |
Electricity Demand | $174,524 | 15,472 |
kW-mo/yr
|
$11.28 |
Electricity Fees | $14,370 | - |
|
- |
Natural Gas | $280,507 | 70,163 |
MMBtu
|
$4.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $39,572 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,902 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7221: Lower temperature during the winter season and vice-versa | $1,391 | $27 |
$1,017
19,596
kWh
|
- | - |
$374
-
MMBtu
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,824 | $161 |
$10,824
208,625
kWh
|
- | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,313 | $261 |
$9,313
179,518
kWh
|
- | - | - | - | |
04 | 3.5131: Recycle white water | $1,246 | $108 |
$(-35.8)
(-689)
kWh
|
$(-11.0)
-
kW-mo/yr
|
- | - |
$1,293
-
Tgal
|
|
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,713 | $534 |
$1,307
25,200
kWh
|
$406
-
kW-mo/yr
|
- | - | - | |
06 | 2.2437: Recover waste heat from equipment | $2,349 | $2,149 |
$(-4.2)
(-77)
kWh
|
- | - |
$2,353
-
MMBtu
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $127 | $255 |
$127
2,453
kWh
|
- | - | - | - | |
08 | 2.3212: Optimize plant power factor | $4,646 | $12,637 | - | - | $4,646 | - | - | |
09 | 2.3192: Use fossil fuel powered generator during peak demand periods | $7,963 | $24,900 |
$1,519
29,280
kWh
|
$8,122
-
kW-mo/yr
|
- |
$(-1,678.0)
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $39,572 | $41,032 |
$24,067
463,905
kWh
|
$8,517
-
kW-mo/yr
|
$4,646 |
$1,049
-
MMBtu
|
$1,293
-
Tgal
|
||
TOTAL IMPLEMENTED | $22,902 | $812 |
$21,246
409,503
kWh
|
$(-11.0)
-
kW-mo/yr
|
- |
$374
-
MMBtu
|
$1,293
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs