ITAC Assessment: IP0044
ITAC logo
ITAC Assessment: IP0044
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Vacuum Forming/Custom Packaging
NAICS 326130: Laminated Plastics Plate, Sheet (except Packaging), and Shape Manufacturing
SIC 2431: Millwork
Sales Range $5
M
to 10
M
# of Employees 58
Plant Area 32,000
ft2
Annual Production 700,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,642 928,800
kWh
Electricity Demand $12,706 5,082
kW-mo/yr
Electricity Fees $10,777 -
Natural Gas $937 96
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,053 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,883

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,883 $78 $7,835
89,139
kWh
$48
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $1,267 $486 $1,169
13,301
kWh
$98
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $145 $57 $145
1,654
kWh
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $6,489 $10,430 $27,355
311,200
kWh
$2,270
-
kW-mo/yr
$(-23,136.0)
-
MMBtu
05 2.7134: Use photocell controls $269 $520 $251
2,855
kWh
$18
-
kW-mo/yr
-
TOTAL RECOMMENDED $16,053 $11,571 $36,755
418,149
kWh
$2,434
-
kW-mo/yr
$(-23,136.0)
-
MMBtu
TOTAL IMPLEMENTED $7,883 $78 $7,835
89,139
kWh
$48
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs