ITAC Assessment: IP0043
ITAC logo
ITAC Assessment: IP0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 9
Plant Area 25,000
ft2
Annual Production 225,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,935 2,863,600
kWh
Electricity Demand $72,481 5,074
kW-mo/yr
Electricity Fees $31,547 -
Natural Gas $21,705 2,856
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,335 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2211: Use optimum temperature $3,192 - - - - $3,192
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $439 - $439
8,678
kWh
- - -
03 2.4224: Upgrade controls on compressors $2,318 $1,216 $2,091
41,340
kWh
$227
-
kW-mo/yr
- -
04 2.3212: Optimize plant power factor $5,219 $5,000 - - $5,219 -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,286 $16,000 $13,774
272,261
kWh
$512
-
kW-mo/yr
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $168 $212 $100
1,985
kWh
$68
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,713 $6,999 $1,696
33,526
kWh
$1,017
-
kW-mo/yr
- -
TOTAL RECOMMENDED $28,335 $29,427 $18,100
357,790
kWh
$1,824
-
kW-mo/yr
$5,219 $3,192
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs