Assessment Year | 2014 |
---|---|
Principal Product | Hose Reels |
NAICS | 332912: Fluid Power Valve and Hose Fitting Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
134,106
ft2
|
Annual Production | 4,200,000
pieces
|
Production Hrs. Annual | 4,200
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $191,136 | 2,404,480 |
kWh
|
$0.079 |
Electricity Demand | $51,602 | 7,217 |
kW-mo/yr
|
$7.15 |
Electricity Fees | $2,766 | - |
|
- |
Natural Gas | $75,147 | 10,207 |
MMBtu
|
$7.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $138,233 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,385 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7221: Lower temperature during the winter season and vice-versa | $9,363 | $210 |
$3,063
38,535
kWh
|
- |
$6,300
-
MMBtu
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,383 | $92 |
$6,383
80,292
kWh
|
- | - | - | |
03 | 2.7135: Install occupancy sensors | $980 | $122 |
$980
12,326
kWh
|
- | - | - | |
04 | 3.6192: Use a less expensive method of waste removal | $82,707 | $12,435 | - | - | - |
$82,707
-
lb
|
|
05 | 2.2511: Insulate bare equipment | $2,997 | $1,104 | - | - |
$2,997
-
MMBtu
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,419 | $512 |
$1,129
14,196
kWh
|
$290
-
kW-mo/yr
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,432 | $4,014 |
$6,432
64,282
kWh
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $27,953 | $54,929 |
$22,141
278,527
kWh
|
$5,812
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $138,233 | $73,418 |
$40,128
488,158
kWh
|
$6,102
-
kW-mo/yr
|
$9,297
-
MMBtu
|
$82,707
-
lb
|
||
TOTAL IMPLEMENTED | $34,385 | $58,943 |
$28,573
342,809
kWh
|
$5,812
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs