ITAC Assessment: IP0004
ITAC logo
ITAC Assessment: IP0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Pneumatic, Hydraulic, and Electric Industrial Automation Actuators
NAICS 333995: Fluid Power Cylinder and Actuator Manufacturing
SIC 3593: Fluid Power Cylinders and Actuators
Sales Range $50
M
to 100
M
# of Employees 83
Plant Area 83,000
ft2
Annual Production 152,099
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,259 1,490,600
kWh
Electricity Demand $32,877 4,223
kW-mo/yr
Electricity Fees $38,537 -
Natural Gas $8,157 8,157
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,621 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,659

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,520 - $4,520
61,997
kWh
- -
02 2.6231: Utilize controls to operate equipment only when needed $2,343 - $1,742
23,900
kWh
$601
-
kW-mo/yr
-
03 2.7221: Lower temperature during the winter season and vice-versa $2,110 - $2,110
28,949
kWh
- -
04 2.7111: Reduce illumination to minimum necessary levels $21,686 $18,150 $16,382
280,682
kWh
$5,304
-
kW-mo/yr
-
05 2.7241: Install outside air damper / economizer on hvac unit $6,462 $15,867 $6,462
88,640
kWh
- -
06 4.112: Replace old machine with new automatic multi-station tool $10,500 $27,000 - - $10,500
TOTAL RECOMMENDED $47,621 $61,017 $31,216
484,168
kWh
$5,905
-
kW-mo/yr
$10,500
TOTAL IMPLEMENTED $30,659 $18,150 $24,754
395,528
kWh
$5,905
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs