ITAC Assessment: IP0002
ITAC logo
ITAC Assessment: IP0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Roll Formed Specialty Tubing and Formed Metal
NAICS 332114: Custom Roll Forming
SIC 3449: Miscellaneous Structural Metal Work
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 126,732
ft2
Annual Production 19,719
ton
Production Hrs. Annual 6,120
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $189,418 2,322,000
kWh
Electricity Demand $0.0 6,840
kW-mo/yr
Natural Gas $24,517 2,604
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,712 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,160

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $18,621 - $18,621
228,206
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,887 - $1,887
20,354
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,515 $140 $1,515
18,560
kWh
-
04 2.2437: Recover waste heat from equipment $3,900 $1,320 - $3,900
-
MMBtu
05 2.4223: Install direct acting units in place of compressed air pressure system in safety system $2,700 $1,250 $2,700
33,050
kWh
-
06 2.4131: Size electric motors for peak operating efficiency $5,124 $4,678 $5,124
62,790
kWh
-
07 2.2511: Insulate bare equipment $1,205 $1,430 $1,205
13,392
kWh
-
08 2.4221: Install compressor air intakes in coolest locations $760 $1,216 $760
9,350
kWh
-
TOTAL RECOMMENDED $35,712 $10,034 $31,812
385,702
kWh
$3,900
-
MMBtu
TOTAL IMPLEMENTED $29,160 $6,138 $25,260
309,556
kWh
$3,900
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs