ITAC Assessment: UM0114
ITAC logo
ITAC Assessment: UM0114
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Injection Molded Plastic Automotive Parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 480
Plant Area 75,000
ft2
Annual Production 45,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $173,123 5,885,698
kWh
Electricity Demand $89,504 11,184
kW-mo/yr
Electricity Fees $(-6,449.0) -
Natural Gas $7,929 1,707
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,163 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,145

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $1,627 $3,217 $1,027
35,170
kWh
$600
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,918 $17,712 $109
4,103
kWh
$96
-
kW-mo/yr
- - - $4,713
03 2.7231: Use radiant heater for spot heating $1,806 $192 - - $1,806
-
MMBtu
- - -
04 4.125: $22,312 $2,560 - - - $22,312
-
lb
- -
05 3.1191: Change procedures / equipment / operating conditions $22,600 $2,400 - - - $22,600
-
lb
- -
06 4.652: Replace existing equipment with more suitable substitutes $16,900 $33,000 - - - - $16,900 -
TOTAL RECOMMENDED $70,163 $59,081 $1,136
39,273
kWh
$696
-
kW-mo/yr
$1,806
-
MMBtu
$44,912
-
lb
$16,900 $4,713
TOTAL IMPLEMENTED $29,145 $23,329 $1,136
39,273
kWh
$696
-
kW-mo/yr
- $22,600
-
lb
- $4,713
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs