ITAC Assessment: IC0324
ITAC logo
ITAC Assessment: IC0324
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Office Space
NAICS 551114: Corporate, Subsidiary, and Regional Managing Offices
SIC 6541: Title Abstract Offices
Sales Range less than $500
k
# of Employees 120
Plant Area 64,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,340
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,903 685,293
kWh
Electricity Demand $23,086 1,645
kW-mo/yr
Electricity Fees $4,343 -
Natural Gas $18,363 2,177
MMBtu
TOTAL YEARLY COSTS $88,695
RECOMMENDED SAVINGS* $95,894 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $65,101 $294,166 $28,833
457,671
kWh
$36,268
-
kW-mo/yr
-
02 2.6212: Turn off equipment during breaks, reduce operating time $1,773 $11,878 $447
7,088
kWh
$1,326
-
kW-mo/yr
-
03 2.2511: Insulate bare equipment $898 $3,747 - - $898
-
MMBtu
04 2.6231: Utilize controls to operate equipment only when needed $3,112 $1,626 $1,453
23,065
kWh
$1,659
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,110 $1,610 $231
3,667
kWh
$879
-
kW-mo/yr
-
06 2.7425: Clean or color roof to reduce solar load $19,325 $143,593 $19,325
306,749
kWh
- -
07 2.4322: Use or replace with energy efficient substitutes $4,575 $44,208 $1,039
16,494
kWh
$1,051
-
kW-mo/yr
$2,485
-
MMBtu
TOTAL RECOMMENDED $95,894 $500,828 $51,328
814,734
kWh
$41,182
-
kW-mo/yr
$3,383
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs