ITAC Assessment: IC0272
ITAC logo
ITAC Assessment: IC0272
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Food Storage
NAICS 493120: Refrigerated Warehousing and Storage
SIC 4222: Refrigerated Warehousing and Storage
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area 153,000
ft2
Annual Production 11,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $219,246 4,193,538
kWh
Electricity Demand $58,846 7,801
kW-mo/yr
Electricity Fees $66,688 -
Natural Gas $93,989 12,307
MMBtu
Waste Disposal Costs
Water Usage $52,954 6,304
Tgal
TOTAL YEARLY COSTS $491,722
RECOMMENDED SAVINGS* $20,460 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,262

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,198 $10,487 $13,525
258,115
kWh
$2,673
-
kW-mo/yr
02 2.7447: Install vinyl strip / high speed / air curtain doors $2,712 $3,525 $2,712
33,914
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $562 $1,098 $314
5,994
kWh
$248
-
kW-mo/yr
04 2.7229: Air condition only space necessary $647 - $647
12,353
kWh
-
05 2.7221: Lower temperature during the winter season and vice-versa $341 $35 $284
5,466
kWh
$57
-
kW-mo/yr
TOTAL RECOMMENDED $20,460 $15,145 $17,482
315,842
kWh
$2,978
-
kW-mo/yr
TOTAL IMPLEMENTED $4,262 $4,659 $3,957
57,727
kWh
$305
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs