ITAC Assessment: IC0264
ITAC logo
ITAC Assessment: IC0264
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Farming Augers
NAICS 332216: Saw Blade and Handtool Manufacturing
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 110,000
ft2
Annual Production 35,000
units
Production Hrs. Annual 6,864
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,065 1,274,844
kWh
Electricity Demand $86,043 3,469
kW-mo/yr
Electricity Fees $18,569 -
Natural Gas $71,114 8,058
MMBtu
Waste Disposal Costs
Water Usage $2,754 226
Tgal
Water Disposal $3,428 249
Tgal
TOTAL YEARLY COSTS $231,974
RECOMMENDED SAVINGS* $19,192 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,955

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $5,084 $2,113 $(-27.0)
(-695)
kWh
$(-38.9)
-
kW-mo/yr
- $5,150
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,944 $4,150 $1,856
47,234
kWh
$2,088
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,361 $10,377 $1,123
28,561
kWh
$1,238
-
kW-mo/yr
- -
04 2.4224: Upgrade controls on compressors $2,600 $15,017 $1,231
31,574
kWh
$1,369
-
kW-mo/yr
- -
05 2.3212: Optimize plant power factor $3,552 $15,893 - - $3,552 -
06 2.7314: Reduce ventilation air $1,650 $6,000 - - - $1,650
-
MMBtu
TOTAL RECOMMENDED $19,192 $53,551 $4,183
106,674
kWh
$4,656
-
kW-mo/yr
$3,552 $6,800
-
MMBtu
TOTAL IMPLEMENTED $7,955 $20,527 $2,979
75,795
kWh
$3,326
-
kW-mo/yr
- $1,650
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs