ITAC Assessment: IC0249
ITAC logo
ITAC Assessment: IC0249
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Tire Shredding Machinery
NAICS 333249: Other Industrial Machinery Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 107,500
ft2
Annual Production 24
units
Production Hrs. Annual 2,600
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $230,608 1,854,544
kWh
Electricity Demand $37,282 7,298
kW-mo/yr
Electricity Fees $27,927 -
Natural Gas $30,152 5,251
MMBtu
TOTAL YEARLY COSTS $325,969
RECOMMENDED SAVINGS* $36,909 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,390

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,457 $154 - $5,457
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,374 $4,100 $7,653
58,417
kWh
$3,721
-
kW-mo/yr
03 2.4221: Install compressor air intakes in coolest locations $1,949 $440 $1,304
9,953
kWh
$645
-
kW-mo/yr
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,062 $18,089 $10,812
82,535
kWh
$5,250
-
kW-mo/yr
05 2.3132: Recharge batteries on during off-peak demand periods $2,067 - - $2,067
-
kW-mo/yr
TOTAL RECOMMENDED $36,909 $22,783 $19,769
150,905
kWh
$17,140
-
kW-mo/yr
TOTAL IMPLEMENTED $15,390 $4,540 $8,957
68,370
kWh
$6,433
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs