| Assessment Year | 2020 |
|---|---|
| Principal Product | Manufacture of Lighting Products |
| NAICS | 335121: Residential Electric Lighting Fixture Manufacturing |
| SIC | 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures |
| Sales Range | $10 M to 50M |
| # of Employees | 300 |
| Plant Area |
508,000
ft2
|
| Annual Production | 1,060,000
units
|
| Production Hrs. Annual | 5,290
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $210,526 | 4,337,257 |
kWh
|
$0.049 | |
| Electricity Demand | $76,650 | 10,247 |
kW-mo/yr
|
$7.48 | |
| Electricity Fees | $132,756 | - |
|
- | |
| Natural Gas | $45,582 | 8,655 |
MMBtu
|
$5.27 | |
| Waste Disposal Costs | |||||
| Water Usage | $24,357 | 2,743 |
Tgal
|
$8.88 | |
| TOTAL YEARLY COSTS | $489,871 | ||||
| RECOMMENDED SAVINGS* | $154,827 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $149,613 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,437 | $2,557 |
$1,356
27,117
kWh
|
$1,082
-
kW-mo/yr
|
- | - | |
| 02 | 3.6123: Burn wood by-products for heat | $4,694 | $9,522 | - | - |
$4,694
-
MMBtu
|
- | |
| 03 | 4.821: Pay bills on time to avoid late fees | $5,410 | - | - | - | - | $5,410 | |
| 04 | 2.7442: Keep doors and windows shut when not on use | $7,230 | - |
$4,037
80,749
kWh
|
$3,193
-
kW-mo/yr
|
- | - | |
| 05 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $4,157 | $12,984 |
$2,974
59,488
kWh
|
$1,182
-
kW-mo/yr
|
- | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,521 | $4,105 |
$1,441
28,810
kWh
|
$81
-
kW-mo/yr
|
- | - | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $520 | $210 |
$311
6,218
kWh
|
$210
-
kW-mo/yr
|
- | - | |
| 08 | 2.8227: Adjust / maintain fork lift trucks for most efficient operation | $128,857 | $36,950 |
$10,735
214,704
kWh
|
$7,872
-
kW-mo/yr
|
- | $110,250 | |
| TOTAL RECOMMENDED | $154,827 | $66,328 |
$20,854
417,086
kWh
|
$13,619
-
kW-mo/yr
|
$4,694
-
MMBtu
|
$115,660 | ||
| TOTAL IMPLEMENTED | $149,613 | $56,596 |
$20,543
410,868
kWh
|
$13,409
-
kW-mo/yr
|
- | $115,660 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs