ITAC Assessment: IC0238
ITAC logo
ITAC Assessment: IC0238
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Bread Crumbs, Meat Coatings, Seasonings, and Batters
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 195,000
ft2
Annual Production 208,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $442,861 8,492,052
kWh
Electricity Demand $115,039 16,976
kW-mo/yr
Electricity Fees $84,020 -
Natural Gas $336,135 78,995
MMBtu
Waste Disposal Costs
Water Usage $197,244 8,816
Tgal
TOTAL YEARLY COSTS $1,175,299
RECOMMENDED SAVINGS* $50,332 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $31,874 $24,382 $(-1,574.9)
(-31,498)
kWh
$(-804.5)
-
kW-mo/yr
$34,253
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,907 $5,000 $14,663
293,268
kWh
$244
-
kW-mo/yr
-
03 2.2414: Use waste heat from hot flue gases to preheat $781 $1,758 - - $781
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,791 $83 - - $1,791
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $979 $240 $979
19,586
kWh
- -
TOTAL RECOMMENDED $50,332 $31,462 $14,068
281,355
kWh
$(-560.8)
-
kW-mo/yr
$36,825
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs