ITAC Assessment: IC0234
ITAC logo
ITAC Assessment: IC0234
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Forged Metal Products
NAICS 331110: Iron and Steel Mills and Ferroalloy Manufacturing
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 117,000
ft2
Annual Production 1,500,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,326 1,192,081
kWh
Electricity Demand $22,207 3,084
kW-mo/yr
Electricity Fees $7,726 -
Natural Gas $5,992 5,025
MMBtu
Waste Disposal Costs
Water Usage $2,558 530
Tgal
TOTAL YEARLY COSTS $117,809
RECOMMENDED SAVINGS* $13,221 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,221

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,669 $32,097 $2,077
29,676
kWh
$592
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,418 $1,107 $2,308
32,974
kWh
$110
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,059 $3,380 $4,962
70,882
kWh
$1,097
-
kW-mo/yr
04 2.4221: Install compressor air intakes in coolest locations $2,075 $3,800 $1,976
28,224
kWh
$100
-
kW-mo/yr
TOTAL RECOMMENDED $13,221 $40,384 $11,323
161,756
kWh
$1,899
-
kW-mo/yr
TOTAL IMPLEMENTED $13,221 $40,384 $11,323
161,756
kWh
$1,899
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs