Assessment Year | 2019 |
---|---|
Principal Product | Electroplating, copper/nickel/chrome on steel, zinc and brass parts |
NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
168,000
ft2
|
Annual Production | 40,000,000
units
|
Production Hrs. Annual | 5,824
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $244,197 | 2,961,834 |
kWh
|
$0.082 | |
Electricity Demand | $29,554 | 8,061 |
kW-mo/yr
|
$3.67 | |
Electricity Fees | $29,970 | - |
|
- | |
Natural Gas | $174,847 | 35,487 |
MMBtu
|
$4.93 | |
Waste Disposal Costs | |||||
Water Usage | $113,483 | 19,987 |
Tgal
|
$5.68 | |
TOTAL YEARLY COSTS | $592,052 | ||||
RECOMMENDED SAVINGS* | $24,628 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $3,221 | $800 |
$2,650
32,320
kWh
|
$571
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,441 | $1,500 |
$1,373
16,668
kWh
|
$68
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,117 | $7,146 |
$6,457
78,357
kWh
|
$661
-
kW-mo/yr
|
- | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,978 | $9,600 |
$4,558
55,584
kWh
|
$420
-
kW-mo/yr
|
- | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $7,871 | $28,000 |
$17,996
218,400
kWh
|
$1,233
-
kW-mo/yr
|
$(-11,358.4)
-
MMBtu
|
|
TOTAL RECOMMENDED | $24,628 | $47,046 |
$33,034
401,329
kWh
|
$2,952
-
kW-mo/yr
|
$(-11,358.4)
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs