ITAC Assessment: IC0227
ITAC logo
ITAC Assessment: IC0227
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Electroplating, copper/nickel/chrome on steel, zinc and brass parts
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 168,000
ft2
Annual Production 40,000,000
units
Production Hrs. Annual 5,824
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $244,197 2,961,834
kWh
Electricity Demand $29,554 8,061
kW-mo/yr
Electricity Fees $29,970 -
Natural Gas $174,847 35,487
MMBtu
Waste Disposal Costs
Water Usage $113,483 19,987
Tgal
TOTAL YEARLY COSTS $592,052
RECOMMENDED SAVINGS* $24,628 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $3,221 $800 $2,650
32,320
kWh
$571
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,441 $1,500 $1,373
16,668
kWh
$68
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,117 $7,146 $6,457
78,357
kWh
$661
-
kW-mo/yr
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $4,978 $9,600 $4,558
55,584
kWh
$420
-
kW-mo/yr
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,871 $28,000 $17,996
218,400
kWh
$1,233
-
kW-mo/yr
$(-11,358.4)
-
MMBtu
TOTAL RECOMMENDED $24,628 $47,046 $33,034
401,329
kWh
$2,952
-
kW-mo/yr
$(-11,358.4)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs