ITAC Assessment: IC0200
ITAC logo
ITAC Assessment: IC0200
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Food Products
NAICS 311930: Flavoring Syrup and Concentrate Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 100
Plant Area 35,000
ft2
Annual Production 400,000,000
units
Production Hrs. Annual 3,629
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,726 834,978
kWh
Electricity Demand $21,186 3,139
kW-mo/yr
Natural Gas $27,879 5,704
MMBtu
TOTAL YEARLY COSTS $105,791
RECOMMENDED SAVINGS* $12,448 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,021 $2,210 $2,021
21,738
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $263 $30 $263
2,831
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,321 $1,626 $5,321
57,218
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,064 $2,230 $2,064
22,203
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,255 $3,131 $1,255
13,491
kWh
06 2.4224: Upgrade controls on compressors $1,524 $2,139 $1,524
16,200
kWh
TOTAL RECOMMENDED $12,448 $11,366 $12,448
133,681
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs