ITAC Assessment: IC0199
ITAC logo
ITAC Assessment: IC0199
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Driveline, Powertrain
NAICS 333517: Machine Tool Manufacturing
SIC 3542: Machine Tools, Metal Forming Types
Sales Range $500
k
to 1
M
# of Employees 160
Plant Area 110,000
ft2
Annual Production 4,000,000
units
Production Hrs. Annual 6,120
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $451,377 7,399,622
kWh
Electricity Demand $102,695 14,993
kW-mo/yr
Natural Gas $11,769 2,616
MMBtu
TOTAL YEARLY COSTS $565,841
RECOMMENDED SAVINGS* $33,979 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $17,264 $4,650 $17,015
278,933
kWh
$249
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,101 $1,146 $3,101
50,836
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $7,964 $3,000 $6,889
112,924
kWh
$1,075
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,064 $50 $2,650
43,450
kWh
$414
-
kW-mo/yr
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,586 $4,651 $2,553
42,554
kWh
$33
-
kW-mo/yr
TOTAL RECOMMENDED $33,979 $13,497 $32,208
528,697
kWh
$1,771
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs