ITAC Assessment: IC0198
ITAC logo
ITAC Assessment: IC0198
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Steel Forgings for the Auto Industry
NAICS 331410: Nonferrous Metal (except Aluminum) Smelting and Refining
SIC 3542: Machine Tools, Metal Forming Types
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 75,000
ft2
Annual Production 4,000,000
units
Production Hrs. Annual 5,110
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $905,847 10,942,512
kWh
Natural Gas $35,769 4,413
MMBtu
TOTAL YEARLY COSTS $941,616
RECOMMENDED SAVINGS* $102,963 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,956

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.8114: Change rate schedules or other changes in utility service $73,989 - - $73,989 -
02 2.7221: Lower temperature during the winter season and vice-versa $3,956 - - - $3,956
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,843 $50 $1,843
22,950
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $3,015 $280 $3,015
37,665
kWh
- -
05 2.4133: Use most efficient type of electric motors $20,160 $4,186 $20,160
352,817
kWh
- -
TOTAL RECOMMENDED $102,963 $4,516 $25,018
413,432
kWh
$73,989 $3,956
-
MMBtu
TOTAL IMPLEMENTED $3,956 - - - $3,956
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs