ITAC Assessment: IC0196
ITAC logo
ITAC Assessment: IC0196
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Injection Molding and Plumbing Parts
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 70,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 5,406
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $239,060 3,130,578
kWh
Electricity Demand $99,572 7,828
kW-mo/yr
Electricity Fees $338,632 -
Natural Gas $16,679 2,574
MMBtu
TOTAL YEARLY COSTS $693,943
RECOMMENDED SAVINGS* $44,370 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,185

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $15,797 $22,558 $10,929
156,131
kWh
$4,868
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,243 $13,967 $8,012
114,456
kWh
$3,231
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,963 $1,299 $1,310
18,725
kWh
$653
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $182 $273 $147
2,102
kWh
$35
-
kW-mo/yr
-
05 2.2614: Use cooling tower or economizer to replace chiller cooling $9,350 $2,000 $5,909
85,223
kWh
$3,441
-
kW-mo/yr
-
06 2.4133: Use most efficient type of electric motors $1,838 $1,500 $1,272
18,170
kWh
$566
-
kW-mo/yr
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $323 $100 $223
3,182
kWh
$100
-
kW-mo/yr
-
08 2.4221: Install compressor air intakes in coolest locations $1,319 $875 $940
13,421
kWh
$379
-
kW-mo/yr
-
09 2.2437: Recover waste heat from equipment $2,355 $500 $49
706
kWh
$18
-
kW-mo/yr
$2,288
-
MMBtu
TOTAL RECOMMENDED $44,370 $43,072 $28,791
412,116
kWh
$13,291
-
kW-mo/yr
$2,288
-
MMBtu
TOTAL IMPLEMENTED $29,185 $38,097 $20,398
291,414
kWh
$8,787
-
kW-mo/yr
-