ITAC Assessment: IC0193
ITAC logo
ITAC Assessment: IC0193
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Wastewater Treatment Facility
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 84
Plant Area 200,000
ft2
Annual Production 24,687,728
lb
Production Hrs. Annual 8,760
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,366,236 20,984,569
kWh
Electricity Demand $33,098 3,102
kW-mo/yr
Electricity Fees $0.1 -
Natural Gas $146,138 21,100
MMBtu
TOTAL YEARLY COSTS $1,545,472
RECOMMENDED SAVINGS* $139,874 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $84,038

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4133: Use most efficient type of electric motors $79,158 $193,800 $66,994
788,171
kWh
$12,164
-
kW-mo/yr
02 2.9114: Use solar heat to make electricty $53,319 $1,029,975 $53,319
627,283
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,932 $14,716 $2,280
26,832
kWh
$1,652
-
kW-mo/yr
04 2.4224: Upgrade controls on compressors $2,517 $7,106 $2,517
29,603
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $948 $1,847 $551
6,448
kWh
$397
-
kW-mo/yr
TOTAL RECOMMENDED $139,874 $1,247,444 $125,661
1,478,337
kWh
$14,213
-
kW-mo/yr
TOTAL IMPLEMENTED $84,038 $210,363 $69,825
821,451
kWh
$14,213
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs